Fabian Hueske created FLINK-2206:
------------------------------------
Summary: JobManager webinterface shows 5 finished jobs at most
Key: FLINK-2206
URL:
https://issues.apache.org/jira/browse/FLINK-2206 Project: Flink
Issue Type: Bug
Components: Webfrontend
Affects Versions: 0.9
Reporter: Fabian Hueske
Priority: Blocker
Fix For: 0.9
The webinterface of the JobManager shows at most 5 finished jobs. This is because only the last 5 JobGraphs are remembered in the JobManager.
The same might apply to canceled and failed jobs.
I think this is very confusing to users and could be easily fixed.
We should add three simple counters in the JobManager to correctly track these numbers and give the right counts to the webinterface.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)