Till Rohrmann created FLINK-20677:
-------------------------------------
Summary: Let JobManagerRunner return JobManagerRunnerResult to better distinguish result cases
Key: FLINK-20677
URL:
https://issues.apache.org/jira/browse/FLINK-20677 Project: Flink
Issue Type: Improvement
Components: Runtime / Coordination
Affects Versions: 1.13.0
Reporter: Till Rohrmann
Assignee: Till Rohrmann
Fix For: 1.13.0
In order to better distinguish the result cases of the {{JobManagerRunner}} I propose to introduce a {{JobManagerRunnerResult}} which can have the values
1) the job was finished successfully
2) the job was not finished
3) the job initialization failed (this is required in order to handle job initialization failures properly)
--
This message was sent by Atlassian Jira
(v8.3.4#803005)