[jira] [Created] (FLINK-19919) Remove legacy scheduling in ExecutionGraph components

classic Classic list List threaded Threaded
1 message Options
Reply | Threaded
Open this post in threaded view
|

[jira] [Created] (FLINK-19919) Remove legacy scheduling in ExecutionGraph components

Shang Yuanchun (Jira)
Zhu Zhu created FLINK-19919:
-------------------------------

             Summary: Remove legacy scheduling in ExecutionGraph components
                 Key: FLINK-19919
                 URL: https://issues.apache.org/jira/browse/FLINK-19919
             Project: Flink
          Issue Type: Sub-task
          Components: Runtime / Coordination
    Affects Versions: 1.12.0
            Reporter: Zhu Zhu
             Fix For: 1.12.0


This is one step towards making ExecutionGraph a pure data structure.
Note that this task mainly targets to remove the legacy codes of scheduling and failover. Codes of Execution state transition and task deployment will be factored out in follow-up tasks.



--
This message was sent by Atlassian Jira
(v8.3.4#803005)