[jira] [Created] (FLINK-16694) Resuming Externalized Checkpoint end-to-end test failed on travis

classic Classic list List threaded Threaded
1 message Options
Reply | Threaded
Open this post in threaded view
|

[jira] [Created] (FLINK-16694) Resuming Externalized Checkpoint end-to-end test failed on travis

Shang Yuanchun (Jira)
Piotr Nowojski created FLINK-16694:
--------------------------------------

             Summary: Resuming Externalized Checkpoint end-to-end test failed on travis
                 Key: FLINK-16694
                 URL: https://issues.apache.org/jira/browse/FLINK-16694
             Project: Flink
          Issue Type: Bug
          Components: Runtime / Metrics, Tests
    Affects Versions: 1.9.2
            Reporter: Piotr Nowojski


Running 'Resuming Externalized Checkpoint (rocks, incremental, scale down) end-to-end test' failed on travis with the error:

{code:java}
The job exceeded the maximum log length, and has been terminated.
{code}

https://api.travis-ci.org/v3/job/664469537/log.txt

Probably because of metrics logging.




--
This message was sent by Atlassian Jira
(v8.3.4#803005)