[jira] [Commented] (FLINK-915) Introduce two in one progress bars

classic Classic list List threaded Threaded
1 message Options
Reply | Threaded
Open this post in threaded view
|

[jira] [Commented] (FLINK-915) Introduce two in one progress bars

Shang Yuanchun (Jira)

    [ https://issues.apache.org/jira/browse/FLINK-915?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14028526#comment-14028526 ]

Robert Metzger commented on FLINK-915:
--------------------------------------

This pull request is not yet done. It requires further discussion regarding a proper integration into our system.

> Introduce two in one progress bars
> ----------------------------------
>
>                 Key: FLINK-915
>                 URL: https://issues.apache.org/jira/browse/FLINK-915
>             Project: Flink
>          Issue Type: Improvement
>            Reporter: GitHub Import
>              Labels: github-import
>             Fix For: pre-apache
>
>         Attachments: pull-request-915-1281267458081589740.patch
>
>
> The two in one progress bars are approximations which are calculated out
> of the job event information.
> Additionally: FINISHING tasks are still shown as running tasks.
> ---------------- Imported from GitHub ----------------
> Url: https://github.com/stratosphere/stratosphere/pull/915
> Created by: [tobwiens|https://github.com/tobwiens]
> Labels: enhancement,
> Created at: Fri Jun 06 17:02:53 CEST 2014
> State: open



--
This message was sent by Atlassian JIRA
(v6.2#6252)